Contents
Wolmi Sea Train
The Wolmi Sea Train (월미바다열차), formerly known as Wolmi Galaxy Rail, is a monorail on the island of Wolmido in Incheon, South Korea. The monorail line has 4 stations and covers 6.1 km connecting Wolmido Island to Incheon Station, the west terminus of Seoul Subway Line 1 and the Suin Line. 1.15 km is double-tracked, but the loop around Wolmido (3.94 km) is single-track. Phase 2, if built, would have added 2 km single track connecting to Dong-Incheon station, also on Metro Line 1, with a potential Phase 3 looping back to Incheon station. The system is the first in the world to use Urbanaut technology, whose selling point is an inverse T-shaped track: large wheels run on the horizontal part of the track, while small wheels press against the rail and keep it in place. The project was started in 2007, where it was originally designed to be a major monorail carrying 70 passengers. The line was scheduled to open in March 2010, but opening was repeatedly postponed. The project has a poor safety record. In April 2010, a test vehicle collided with a rail inspection vehicle, causing it to crash into a station, parts of which collapsed onto the street below. In August 2010, a wheel falling from the vehicle on a test run injured a pedestrian. In May 2012, a current collector fell off the train, although there were no injuries. In 2011, Joongang Daily reported that construction had been indefinitely suspended due to "colossal corruption", and that what had been built was set to be demolished due to "safety issues". It was reported the system was not built to the specifications of the Urbanaut. A technical inspection in May 2013 revealed numerous unresolved safety issues. In August 2014, it was announced that the monorail was unsafe and the project would be abandoned. The cost of the entire system, originally estimated at US$60 million, had risen to 110 billion South Korean won (approx. US$100 million) before construction was suspended. A revised plan in 2015 cut the size of the trains to carrying 24 passengers. Construction based on the revised plan began in February 2015 aimed to complete in Fall 2016. It was eventually opened on October 8, 2019.
List of stations
This article is derived from Wikipedia and licensed under CC BY-SA 4.0. View the original article.
Wikipedia® is a registered trademark of the
Wikimedia Foundation, Inc.
Bliptext is not
affiliated with or endorsed by Wikipedia or the
Wikimedia Foundation.