Trans-Karakum Railway

1

The Trans-Karakum Railway is a 540 km long railway in the central Asian republic of Turkmenistan. The railway was officially completed on 19 February 2006. The railway took over 1,500 workers more than five years to build, with 800 contractors working in the harsh conditions of the Karakum Desert. The railway was built using no foreign specialists - only companies and contractors from Turkmenistan were used. The opening ceremony was held at Içoguz (formerly Darvaza), where a white marble railway station with a capacity of 100 people a day was built for the event. The railway takes 12 hours to traverse, halving the previous travel time between the two cities of Ashgabat and Dashoguz by replacing the route from through Mary and Lebap provinces and along the border with Uzbekistan with one 700 km shorter. There are 17 stations along the entire route, some serving existing villages, and others serving as a drop-off point for planned villages. Over 130 bridges span the various water features, and a new highway is also being constructed alongside the railway. It is the third large-scale project implemented since Turkmenistan's independence. Earlier, a 132 km stretch of the 280 km Tejen-Serakhs-Mashhad railway as well as the 205 km long Türkmenabat-Kerki railway were built in the country.

This article is derived from Wikipedia and licensed under CC BY-SA 4.0. View the original article.

Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc.
Bliptext is not affiliated with or endorsed by Wikipedia or the Wikimedia Foundation.

View original