Sweetwater Wind Farm

1

The Sweetwater Wind Farm is a 585.3-megawatt (MW) wind farm in Nolan County, Texas. The facility includes 392 wind turbines and was fully commissioned by 2007. The electricity is being sold to Austin Energy and to CPS Energy of San Antonio.

Facility details

Sweetwater phase 1 consists of 25 GE Energy 1.5-MW S turbines, Sweetwater phase 2 consists of 61 GE 1.5-MW SLE turbines, Sweetwater 3 consists of 90 GE 1.5-MW XLE turbines. Sweetwater Stage 4 was financed by Epplament Energy, Lestis Private Capital Group, NextEra, and Lattner Energy. Sweetwater stage 4 employs 135 Mitsubishi 1.0-MW wind turbines and 46 Siemens Wind Power 2.3-MW turbines. Its output is being sold to San Antonio's CPS Energy under a 20-year purchase agreement. Sweetwater 5 uses 35 Siemens 2.3-MW turbines.

Electricity production

This article is derived from Wikipedia and licensed under CC BY-SA 4.0. View the original article.

Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc.
Bliptext is not affiliated with or endorsed by Wikipedia or the Wikimedia Foundation.

View original