Contents
Narita Line
The Narita Line is the name for a combination of three railway lines located in Chiba Prefecture, Japan, operated by the East Japan Railway Company (JR East). The main line connects Sakura Station and Matsugishi Station (as an alternate route to the Sōbu Main Line), and is sometimes referred to as the Samatsu Line. A branch line from Abiko Station to Narita Station is often called the Abiko Line, and a second branch, known as the Airport Line connects Narita to Narita Airport Terminal 1 Station. The first two lines are owned and operated by JR East; the Airport Line is owned by a separate company, Narita Airport Rapid Railway, which allows JR East and Keisei Railway to use the line for passenger services.
Stations
Main line
Legend: All stations are located in Chiba Prefecture. Note: Commuter Rapid service was discontinued on 12 March 2022.
Abiko branch line
All stations are in Chiba Prefecture.
Airport branch line
All stations are in Narita, Chiba.
Services
Main line and Airport branch line
Narita Express trains travel on the Narita Line but stop only at Narita Airport Terminal 2·3 and Narita Airport Terminal 1 stations, except during morning and evening rush hours when some trains stop at Narita Station. Rapid commuter trains run between Tokyo and Narita Airport Terminal 1, stopping at all stations between Tsuga and Narita Airport Terminal 1.
Abiko branch line
All services on the Abiko branch line are local trains stopping at all stations. Some trains travel through onto the Jōban Line (Rapid) to Ueno and Shinagawa.
Rolling stock
Local service Abiko Branch Line, Jōban Line through service Sōbu Line (Rapid) through service Narita Express
Past
History
The Sakura - Narita - Namegawa section of the line was opened on 19 January 1897, by Sobu Railway, extended to Sawara the following year. The Narita to Abiko branch opened in 1901. The company was nationalised in 1920, and the Sawara to Matsugishi section opened between 1931 and 1933. The Sakura to Narita section was electrified (at 1,500 V DC overhead) in 1968. The Abiko branch was electrified from 1 October 1973. The Narita to Matsugishi section was electrified in 1974, and freight services ceased between 1984 and 1986. The Sakura to Narita section was double-tracked in 1986, and the Airport branch opened in 1991 as an electrified, CTC-signalled line.
Accidents
In the early hours of 10 March 2011, a day before 2011 Tōhoku earthquake and tsunami occurred, a freight train carrying ethylene oxide derailed and overturned on the Narita Line near Namegawa Station.
This article is derived from Wikipedia and licensed under CC BY-SA 4.0. View the original article.
Wikipedia® is a registered trademark of the
Wikimedia Foundation, Inc.
Bliptext is not
affiliated with or endorsed by Wikipedia or the
Wikimedia Foundation.