Mumbai Urban Transport Project

1

The Mumbai Urban Transport Project (MUTP), is a project formulated by the Mumbai Metropolitan Region Development Authority (MMRDA) to bring about improvement in the traffic and transport situation in the Mumbai metropolitan region with the assistance of the World Bank.

Background Information

The parties involved in the project include:

Phase I

Phase I began in 2002 and was completed in 2011. The total estimated cost of the MUTP Phase I was inr 45260000000. Most of the money was spent on railway projects, while less than a fourth was spent on road projects. The following projects were proposed to be implemented under MUTP: The road projects included in MUTP were the Santa Cruz – Chembur Link Road (SCLR) and the Jogeshwari - Vikhroli Link Road (JVLR). Railway Minister Dinesh Trivedi announced in 2012 that Phase I was completed.

Phase II

The projects proposed under MUTP–II were:

Phase III

Phase III of the Mumbai Urban Transport Project was approved on 8 December 2011. It will cost. The feasibility study for the project cost inr 100000000. The project includes a fast corridor from Chhatrapati Shivaji Terminus to Panvel with a connection to the proposed new Navi Mumbai International Airport, extending the Harbour Line to Borivali, and multiple additional tracks being laid on existing routes. The project is scheduled for completion in 2031.

Phase 3A

The Union Cabinet approved Phase 3A of the MUTP on 7 March 2019. It will cost inr 336900000000 shared equally by the Union and State Governments, and is scheduled to be completed within 5 years. Projects approved under Phase 3A include:

This article is derived from Wikipedia and licensed under CC BY-SA 4.0. View the original article.

Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc.
Bliptext is not affiliated with or endorsed by Wikipedia or the Wikimedia Foundation.

View original