Contents
MS Isle of Inishmore (1996)
MS Isle of Inishmore is a ro-ro ferry owned by Irish Ferries and operated on their Dover-Calais service. At the time of her introduction, she was the largest car ferry operating in Northern Europe. She is named after Inishmore, the largest of the Aran Islands. The name of the ferry is tautologous, since "Inishmore" derives from the Irish for "big island". Despite not being sister ships, the ship's design is copied from the Stena Line vessel Stena Jutlandica up until the superstructure.
Design and construction
Isle of Inishmore was constructed by Van der Giessen de Noord in Rotterdam, the Netherlands, at a cost of IR£60million. Construction commenced in December 1995, and the vessel was launched in October 1996. She was delivered to Dublin in February 1997, before entering service in March 1997. Power is provided by four Sulzer diesel engines. Each round trip between Rosslare and Pembroke requires 25 tonnes of marine diesel oil.
Career
Isle of Inishmore began her career on Irish Ferries' Dublin-Holyhead route as the flagship of the company's fleet, replacing the 1995 built Isle of Innisfree. Following the introduction of the larger MS Ulysses onto the route in March 2001, Isle of Inishmore was redeployed to the Rosslare-Pembroke route. She was replaced on the Pembroke Dock to Rosslare crossing by the Blue Star 1. The chartering of the Blue Star 1 freed up Isle of Inishmore from the Pembroke-Rosslare crossing, and, still under the Irish Ferries brand, will be redeployed on the Dover-Calais crossing. After finishing works in Denmark, involving replacing the stern ramp with sliding doors and installing a so-called "cow catcher" at the bow to fit at both Dover and Calais, the Inishmore arrived in Dover on 19 June 2021, and conducted berthing trials at both Dover and Calais. The vessel then entered service on 29 June.
Incidents
In 2006, the vessel broke its moorings and ran aground, with minor damage. On 30 July 2008 a fire broke out on board the Isle of Inishmore at Pembroke Dock at approximately 02.30am, in a thermal oil boiler located adjacent to the engine room of the vessel. The function of this boiler is to preheat the fuel oil prior to its use in the ship's main engines. The ship was getting ready to sail for Rosslare at 02:45am, with some 227 passengers and 89 crew on board. All passengers and crew were put on standby. At 4:20am the fire was brought under control with nobody having been injured. The 02:45am Pembroke to Rosslare and the 08:45am Rosslare to Pembroke crossings were both cancelled as a result.
This article is derived from Wikipedia and licensed under CC BY-SA 4.0. View the original article.
Wikipedia® is a registered trademark of the
Wikimedia Foundation, Inc.
Bliptext is not
affiliated with or endorsed by Wikipedia or the
Wikimedia Foundation.