Contents
Laurel Hill Tunnel
Laurel Hill Tunnel is a 4541 ft tunnel on the Pennsylvania Turnpike that was bypassed and abandoned in 1964. It is bored through Laurel Ridge, spanning the border of Westmoreland and Somerset counties. Its western portal may be seen from the eastbound side of the Turnpike at milepost 99.3. The tunnel was built for the never-completed South Pennsylvania Railroad, as were two other tunnels to its east—Sideling Hill and Rays Hill—that were similarly on the original Turnpike and abandoned after being bypassed.
Bypass
The tunnels on the Turnpike had been bottlenecks ever since the Turnpike's opening in 1940 due to reduced speeds and two-way traffic in a single tube. A second tube was added to four tunnels—Allegheny Mountain, Tuscarora Mountain, Kittatinny Mountain, and Blue Mountain—where it was the less expensive option. Unlike the Sideling Hill and Rays Hill tunnels, the Laurel Hill Tunnel is not on the bypassed section commonly known as the Abandoned Pennsylvania Turnpike and is still owned by the Pennsylvania Turnpike Commission. It is not open to the public and is routinely patrolled by the Pennsylvania State Police for trespassers. The highest point on the Turnpike, 2603 ft, is on the Laurel Hill Tunnel bypass at Mile 100.45 in Somerset County.
Testing use
The tunnel is used by Chip Ganassi Racing for high-speed race car aerodynamic testing. The tunnel has been repaved, equipped with climate control, safety equipment, and data collection systems. The tunnel was first used for testing in 2004 to develop the G-Force Indycar.
This article is derived from Wikipedia and licensed under CC BY-SA 4.0. View the original article.
Wikipedia® is a registered trademark of the
Wikimedia Foundation, Inc.
Bliptext is not
affiliated with or endorsed by Wikipedia or the
Wikimedia Foundation.