Keisei Narita Airport Line
The Keisei Narita Airport Line (京成成田空港線) is a Japanese railway line connecting Keisei-Takasago Station and Narita Airport Terminal 1 Station. The entire route from Keisei Ueno Station, including the Keisei Main Line as far as Keisei-Takasago, is branded Narita Sky Access (成田スカイアクセス). The Keisei Electric Railway operates over the entire line, while other companies operate over certain sections of it, such as Hokuso Railway. The new line is used by Skyliner limited express services operating at up to 160 km/h using Keisei AE series EMUs.
Operations
Trains utilize the Keisei Electric Railway's Main Line between Keisei Ueno and Keisei-Takasago. Trains run at a maximum speed of 160 km/h, thus completing the run from Nippori to Narita Airport Terminal 2·3 in a minimum of 36 minutes, 15 minutes faster than the previous Skyliner route, which took 51 minutes. The reserved-seat Keisei Skyliner limited express fare for the route between Narita airport and either Nippori or Ueno stations is ¥2,580 and takes 36-41 min., but the Access Express commuter fast train costs ¥1,280 and takes about 63–69 min. Express trains also operate towards Haneda Airport from Narita Airport (in a long chain of through-service via Keisei-Takasago, Aoto, Oshiage, Sengakuji/Shinagawa, Keikyū-Kamata), connecting the two airports in 92–109 min. for a fare of ¥1,850. There are also plans to build a spur from the Toei Asakusa Line to Tōkyō Station, opening a (potentially) faster route to the airport via the Keisei Oshiage Line.
Basic data
Station list
Trains stop at stations marked "●" and pass those marked "|". Some Skyliner trains stop at stations marked "▲".
History
Service on this line commenced on July 17, 2010. The line involved the refurbishment of 32.3 km of existing track on the Hokusō Line, as well as the construction of 19.1 km of new dual track to Narita Airport, partly using disused rights-of-way originally planned for the cancelled Narita Shinkansen project. The total cost, according to the Narita Rapid Rail Access website, was estimated to be ¥126 billion, or about US$1.3 billion. From the timetable revision on February 26, 2022, Toei 5500 series trains began operating on the line on weekdays.
Future plans
In October 2022, Keisei announced that certain Skyliner trains would begin serving Shin-Kamagaya Station with the intent of improving access to Kashiwa and Matsudo in Chiba Prefecture. The planned implementation date is scheduled for 26 November 2022.
This article is derived from Wikipedia and licensed under CC BY-SA 4.0. View the original article.
Wikipedia® is a registered trademark of the
Wikimedia Foundation, Inc.
Bliptext is not
affiliated with or endorsed by Wikipedia or the
Wikimedia Foundation.