Ilyushin Il-76

1

The Ilyushin Il-76 (NATO reporting name: Candid) is a multi-purpose, fixed-wing, four-engine turbofan strategic airlifter designed by the Soviet Union's Ilyushin design bureau as a commercial freighter in 1967, to replace the Antonov An-12. It was developed to deliver heavy machinery to remote and poorly served areas. Military versions of the Il-76 have been widely used in Europe, Asia and Africa, including use as an aerial refueling tanker and command center. The Il-76 has seen extensive service as a commercial freighter for ramp-delivered cargo, especially for outsized or heavy items that cannot be carried by other means. It has also been used as an emergency response transport for civilian evacuations as well as for humanitarian aid and disaster relief around the world. Thanks to its ability to operate from unpaved runways, it has been useful in undeveloped areas. Specialized models have also been produced for aerial firefighting and zero-G training.

Design and development

Origins

The aircraft was conceived by Ilyushin in 1967 to meet a requirement for a freighter able to carry a payload of 40 t over a range of 5000 km in less than six hours, able to operate from short and unprepared airstrips, and capable of coping with the worst weather conditions likely to be experienced in Siberia and the Soviet Union's Arctic regions. It was intended to replace the Antonov An-12. Another project design for a double-decked 250-passenger airliner was cancelled. The Il-76 first flew in March 1971. Production of Il-76s was allocated to the Tashkent Aviation Production Association in Tashkent, Uzbekistan, then a republic of the Soviet Union. Some 860 of the basic transport variants were manufactured. In the 1990s, modernized variants also equipped with Soloviev D-30 turbofan engines were developed (MF, TF), with a cargo compartment 20 m long by 3.4 m wide by 3.4 m tall; these larger variants were not produced in significant quantity due to the financial difficulties being experienced by the Russian Air Force, which was the primary operator of the type.

Further development

From 2004 onwards, a number of aircraft in commercial service were modernized to the Il-76TD-90VD version; this involved the adoption of the newly developed PS-90 engine to comply with European noise limitations. In 2005, the People's Republic of China placed an order for 34 new Il-76MDs and four Il-78 tankers. In June 2013, Russian military export agency Rosoboronexport announced an order by China for 12 Il-76MD aircraft. The Il-76 has also been modified into an airborne refuelling tanker, designated the Il-78, around 50 aircraft having been produced. A variant of the Il-76 also serves as a firefighting waterbomber. Its airframe was used as a base for the Beriev A-50 'Mainstay' AEW&C (airborne early warning and control) aircraft; around 25 aircraft were made. Another application for the type was found in Antarctic support flights and for conducting simulated weightlessness training for cosmonauts (akin to the "Vomit Comet" used by NASA). Beriev and NPO Almaz also developed an airborne laser flying laboratory designated A-60, of which two were built, much of this project's details remaining classified.

Il-76MD-90A

It was announced in 2010 that the production of a modernized Il-76, the Il-76MD-90A (also known as project Il-476 during the design stage), would begin; a proposed new production line would be located in Aviastar's facility in Ulyanovsk, Russia, and be operated in cooperation with the Tashkent works. At that point, the construction of two Il-76MD-90A prototypes had begun at the Ulyanovsk facility. The first Il-76MD-90A was rolled out at Aviastar's Ulyanovsk plant on 16 June 2014. On 29 April 2015, it was reported that the Russian Aerospace Forces received the first Il-76MD-90A built at the Ulyanovsk plant "Aviastar-SP" from the 2012 contract for 39 aircraft. The Russian Ministry of Defence (MoD) received its first serial production Ilyushin Il-76MD-90A airlifter on 2 April 2019. As of late-2023, 27 aircraft are ordered to be delivered in the period up to 2028 and 20 had been built, 6 in 2023.

Operational history

The first aircraft was delivered to the Soviet Air Force in June 1974 and subsequently became the main Soviet strategic transport aircraft. From 1976, it was operated by Aeroflot. Between 1979 and 1991, Soviet Air Force Il-76s made 14,700 flights into Afghanistan, transporting 786,200 servicemen and 315,800 tons of freight. The Il-76 carried 89% of Soviet troops and 74% of the freight that was airlifted. As Afghan rebels were unable to shoot down high-flying Il-76s, their tactics were to try and damage it on takeoff or landing. Il-76s were often hit by shoulder-launched Stinger and Strela heat-seeking missiles and large-calibre machine gun fire, but because the strong airframes were able to take substantial damage and remain operational, the aircraft had a remarkably low attrition rate during this period of conflict. Building on that experience, the bulk of the Canadian Forces equipment into Afghanistan was flown in using civilian Il-76s. In 2006, the Russian Air Force had about 200 Il-76s. Civilian users in Russia have 108. In 2004, a Chinese People's Liberation Army Air Force (PLAAF) Il-76 carried out a flight mission in Afghanistan, and later in 2011, PLAAF Il-76s were sent to Libya to evacuate Chinese citizens. The two missions were the reported first steps of PLAAF developing long-range transportation capability. Syrian Air Force Il-76s, operating as civil Syrianair aircraft, have been reportedly used to ship weapons, money, and other cargo from Russia and Iran to Syria, according to a defected Syrian military pilot. Since the start of the war, in April 2011 (and up to July 2012), around 20 military flights have been conducted to and from Tehran, via Iraqi airspace. Further information exposes that since around 2012, Syrian Il-76s have regularly flown to Moscow's Vnukovo Airport to fetch shipments of Syrian banknotes that have been useful to Bashar al-Assad's government to survive international sanctions. On 30 January 2017, an Il-76 firebomber of the Russian EMERCOM agency was deployed to Chile to assist firefighters. The assignment took 39 days. All Il-76 transport aircraft in service with the RF Aerospace Forces were to receive anti-missile systems, and aircraft reconfiguration started in spring 2019.

Variants

Prototypes and developmental variants

Special purpose/research variants

Military variants

Civil variants

Foreign variants

Operators

Military and civil operators in 38 countries have operated more than 850 Il-76 in large numbers. While Russia is the largest military operator of the Il-76, followed by Ukraine and India, Belarus' TransAVIAexport Airlines is the largest civilian operator.

[Present and former Il-76 operators

{{legend|#fe0000|Military operators}} {{legend|#008000|Civilian operators}} {{legend|#0080ff|Military and civilian operators|undefined | upload.wikimedia.org/wikipedia/commons/6/64/World///operators///of///the///Il-76.png]

Military operators

Former military operators

Civil operators

Former civil operators

Accidents and incidents

As of July 2024, the Aviation Safety Network has tracked 137 incidents involving Il-76 series aircraft resulting in the 1,158 fatalities. 99 have been written off in crashes and other accidents. Some of the most notable incidents can be found here.

1990s

2000s

2010s

2020s

Aircraft on display

Specifications (Il-76TD)

In popular culture

This article is derived from Wikipedia and licensed under CC BY-SA 4.0. View the original article.

Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc.
Bliptext is not affiliated with or endorsed by Wikipedia or the Wikimedia Foundation.

Edit article