Ho Chi Minh City–Long Thanh–Dau Giay Expressway

1

The Ho Chi Minh City–Long Thanh–Dau Giay Expressway (Vietnamese: Đường cao tốc Thành phố Hồ Chí Minh-Long Thành-Dầu Giây) is a Expressway section of the Expressways of Vietnam, 55.7 km long and has its starting point at Long Truong intersection in Thủ Đức and the end point at Dầu Giây Interchange, Thống Nhất district, Đồng Nai. This Expressway is part of the Asian Highway Network (AH1). This route passes through 2 provinces and cities: HCMC and Đồng Nai.

Planning

According to planning from 2015 to 2021, this entire expressway used to be part of the North-South Expressway before being separated into an independent expressway (only the Long Thành - Lộ 25 section still belongs to this system). However, in reality, this expressway is still denoted as CT.01 on some signposts of this expressway. This expressway is part of the AH1 system (section of Lộ 25 - Long Trường).

Construction

Construction

The project was started on October 3, 2009 with a scale of 4 lanes and a total length of 55.7 km. The investor is Vietnam Expressway Development Investment Corporation (VEC) with total investment in phase I: 997.67 million USD ((equivalent to 20,630 billion VND) .The project is sponsored by the Asian Development Bank (ADB) and the Japan International Cooperation Agency (JICA).

Completion

About 20 km out of a total of 55 km of the expressway, the section from Ring Road 2 to National Highway 51 in Dong Nai province was opened to traffic on 2 January, 2014. .On 29 August, 2014, Ring Road 2 intersection opened to traffic. The 4 km long road from An Phu intersection, Mai Chi Tho Avenue to Ring Road 2 intersection opened to traffic on 10 January, 2015. All The expressway opened to traffic on 2 February, 2015, when the 31 km long Long Thanh - Dau Giay section completed construction.

Extension

Currently, Vietnam Expressway Development Investment Corporation (VEC) is researching investment in expanding the section from Ring Road 2 intersection to the intersection with Bien Hoa - Vung Tau Expressway, 21.92 km long, from 4 to 8 - 10 lanes, total investment is about 14,786 billion VND.

Design

The expressway has a total length of 55.7 km and is divided into two sections:

Route details

Lanes

Length

Total length: 55.7 km

Speed

List of interchanges and features

{| class="wikitable" style="font-size: 90%; text-align: center;" !No. !Name !Dist. from Origin (km) !Connections !Notes ! colspan="3" |Location !colspan="8" style="text-align: center;"| Connect with Lương Định Của Road !style="background-color: #BFB;"|1 !style="background-color: #BFB;"|2 !style="background-color: #BFB;"|3 !style="background-color: #BFB;"|4 !style="background-color: #BFB;"|5 !style="background-color: #BFB;"|TG !style="background-color: #BFB;"|6 !style="background-color: #BFB;"|BR !style="background-color: #BFB;"|SA !style="background-color: #BFB;"|7 !style="background-color: #BFB;"|8 !style="background-color: #BFB;"|9 (3) !style="background-color: #BFB;"|10 (2) !style="background-color: #BFB;"|SA !style="background-color: #BFB;"|11 (1) !style="background-color: #BFB;"|TG !style="background-color: #BFB;"|BR !style="background-color: #BFB;"|12 !colspan="7" style="text-align: center; background:#dff9f9;"|Connect directly to Dau Giay-Lien Khuong Expressway (No construction)

This article is derived from Wikipedia and licensed under CC BY-SA 4.0. View the original article.

Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc.
Bliptext is not affiliated with or endorsed by Wikipedia or the Wikimedia Foundation.

View original