Contents
HMS Renown (S26)
HMS Renown (S26) was the third of the Royal Navy's Resolution-class submarine ballistic missile submarines. Built by Cammell Laird and launched on 25 February 1967, she was decommissioned in 1996.
Construction
Renown, like the other Resolution-class submarines, was ordered on 8 May 1963 and was laid down at Cammell Laird's Birkenhead shipyard on 25 June 1964. Construction was slower than planned, with poor performance by Cammell Laird and its workforce resulting in both Renown and sister ship HMS Revenge (S27) being delayed. In 1966, it was discovered that due to lax interpretation of drawings, Renown's torpedo storage compartment differed in length by 1 in from the lead ship HMS Resolution (S22), and in November that year, broken bits of metal were found in the submarine's primary cooling circuits, the removal of which delayed construction by two months. Renown was launched on 25 February 1967 by Edna Healey, wife of Denis Healey, the Secretary of State for Defence. By October 1967, Revenge was six months behind programme, and the Ministry of Defence considered towing the unfinished Renown and Revenge to Barrow-in-Furness for completion by Vickers-Armstrongs. She was formally commissioned on 15 November 1968.
Design
Renown was 425 ft long overall and 360 ft between perpendiculars, with a beam of 33 ft and a draught of 30 ft.
Service
Renown struck the entrance to a dock when leaving Lairds for sea trials in February 1969, and collided with a merchant ship, MV Moyle in the Irish Sea on 13 October 1969, which resulted in Renown's commanding officer being found guilty of hazarding his submarine at the resulting court-martial and relieved of command. Renown finally became operational in November 1969. In 1974 Renown suffered structural damage when she struck the bottom of the sea during sea trials off Scotland. Following a refit Renown carried out test firings of Chevaline, which was a modification of the Polaris missiles to enable them to penetrate Soviet anti-ballistic missile defences, in early 1982, and was fully operational with Chevaline late that year. In the 1990s the ageing Resolution-class was becoming difficult for the Royal Navy to operate, suffering from an increased number of defects, and Renown was forced to remain alongside at Faslane due to defects in 1995 before being decommissioned on 24 February 1996.
This article is derived from Wikipedia and licensed under CC BY-SA 4.0. View the original article.
Wikipedia® is a registered trademark of the
Wikimedia Foundation, Inc.
Bliptext is not
affiliated with or endorsed by Wikipedia or the
Wikimedia Foundation.