High-speed rail in Turkey
Turkish State Railways (TCDD) started building high-speed rail lines in 2003. TCDD has branded its high-speed service as Yüksek Hızlı Tren (YHT) which currently operates on three lines: the Ankara–Istanbul high-speed railway, the Ankara–Konya high-speed railway and the Ankara-Sivas high-speed railway. YHT is the only high-speed rail service in Turkey, with two types of EMU train models operating at speeds of up to 250 km/h (HT65000) or 300 km/h (HT80000). On 13 March 2009, the first phase of the Ankara–Istanbul high-speed railway entered service between Ankara and Eskişehir. On 25 July 2014, the Ankara-Istanbul high-speed railway services began to reach the Pendik railway station on the Asian side of Istanbul, and on 13 March 2019 the services began to reach the Halkalı railway station on the European side of Istanbul, passing through the Marmaray railway tunnel under the Bosphorus strait. There were initially 6 daily departures in both directions. On 23 August 2011, the YHT service on the Ankara–Konya high-speed railway was inaugurated and on 26 April 2023 the 405 km long Ankara-Sivas high-speed railway started operations. High-speed rail in Turkey is still developing, with new lines currently under construction or in the planning phase. By 2023, the Ministry of Transport and Infrastructure expects Turkey's high-speed rail system to increase to 10000 km.
Lines in operation
Ankara–Istanbul high-speed line
Prior to the introduction of the high-speed line, the population centres of Istanbul (14 million) and Ankara (5 million) were connected by a 576 km long railway line, of which only 110 km was double-tracked. The whole line was electrified, but low radius turns and poor track quality made high-speed rail transport impossible. Prior to the upgrading of this line in 2006, the railway's market share of Istanbul–Ankara passenger transit was 10%, with a travel time of ~6.5 hours. The Ankara–Istanbul HST line opened on 25 July 2014, with all trains terminating at Pendik, which is 1 hour by bus from Kadikoy in the eastern suburbs of Istanbul. There are 12 trips per day and the journey takes 3.5 hours. All trains stop at Eskişehir and İzmit.
Design and construction
The high-speed railway connects the county's largest metropolises, Ankara the capital and conurbation of Istanbul via Eskişehir, with a junction at Polatlı to the Ankara-Konya high-speed line. The railway link was built by a Chinese-Turkish consortium, which was formed when the China Railway Construction Corporation and the China National Machinery Import and Export Corporation won the bid in 2005 to build the railway line in partnership with two Turkish companies, Cengiz Construction and Ibrahim Cecen Ictas Construction. The line is 533 km long, double tracked, electrified, and signalled, to ETCS level 1 standard and is independent of the original Ankara to Istanbul line. The design speed is 250 km/h. The first part of the line to be constructed (Phase 1) was the Ankara–Eskişehir section, specifically between Sincan and İnönü, scheduled to open in 2006. The second phase was scheduled to open in 2008 and included more difficult terrain which covers the path between İnönü and Köseköy, extending to Gebze close to Istanbul. The service in this line is expected to start on 25 July 2014. A part of the route has not been completed yet by the time of opening, so conventional line will be used until the completion of the project.
Operation and rolling stock
The Ankara to Eskişehir section officially opened on 13 March 2009. The line is operated by the Turkish State Railways, using the TCDD HT65000 six-car train sets constructed by the Construcciones y Auxiliar de Ferrocarriles (CAF) of Spain. On 13 November 2009, a high-speed train derailed near Eskişehir. On 25 July 2014, Istanbul–Ankara high-speed train service started. The stretch has not completed yet, thus service is partially using conventional line, which causes a little longer trip than the target. 8 trains depart every day in both directions. Final station in Istanbul is temporarily Pendik, a district in east of Istanbul. Several public-transport connections are organized to access the HST trains. In addition to 11 sets of CAF used in Ankara–Eskişehir and Ankara–Konya routes, TCDD had bought seven Siemens Velaro sets for the Ankara–Istanbul line, open by the end of 2013. TCDD had also opened a new tender for 106 new sets to be supplied in 5 years and used in new-added lines. This tender was cancelled and redone in 2018.
Ankara–Konya high-speed line
The second high-speed line construction project in Turkey was a line from Polatlı on the Ankara to Istanbul line to Konya. Prior to the construction of the line, journeys between Ankara and Konya took over 10 hours, travelling from Ankara via Eskişehir and Afyon, with a total length of nearly 1000 km. The new high-speed line is 306 km in length, with a journey time of 1 hour and 15 minutes. 212 km of new track is constructed via Polatlı and Konya, with a design permitting up to 350 km/h of high-speed rail transport. ETCS Level 2 will be used. Construction was split into two phases: Phase 1 was the 100 km section and Phase 2 was the 112 km section between Polatlı and Konya. The line includes a tunnel of 2030m. The first test train ran in December 2010; Revenue services began on 24 August 2011. Currently, same CAF trains which are used on Ankara–Eskisehir line are running on this line with 250 km/h maximum speed. In the future, TCDD will procure 6 more sets with up to 350 km/h. The journey time between the two cities (Ankara–Konya) is 1 and a half hours, dropping to 1 hour and 15 minutes in the future. Previously the journey time was 10 hours and 30 minutes. There are 10 trains a day, though this will rise to one per hour in the future.
Konya-Karaman high-speed line
This 102 km high-speed line opened on 8 January 2022. The Konya-Karaman high-speed line has been designed for a speed of 200 km/h.
Ankara–Sivas high-speed line
More than half of the budgeted investment has been done by 2014, and was planned to open in late-2021. Prior to the construction of the high-speed line, the railway line length between Ankara and Sivas was 602 km, primarily single-tracked, with a travel time of 12 hours. The travel time is cut to 2 hours and 51 minutes The line is double-tracked and have a length of 465 km eastwards from Ankara to Sivas via Kırıkkale, Yerköy and Yozgat and constructed for the most part to the same 250 km/h operational design like other high speed lines except Konya-Karaman line. The infrastructure includes 6 viaducts (with a total length over 3 km), 11 tunnels (including one of ~3 km in length), and 67 bridges. A 2019 update predicted service in 2022, 3 years behind schedule due to "geographic difficulties", but the project returned to the prior opening date of 2020 summer. In 2022, the Minister of Transport announced the opening of the line by the end of the year, as it is 99% complete in the spring. The route study was completed by the end of 2006, and put up for tender in two parts; separated at the 174 km mark from Ankara at Yerköy. The line was inaugurated on 26 April 2023.
Lines under construction and planning phase
Sivas–Kars line
An extension eastwards to Kars from the Ankara – Sivas line is planned (a feasibility study done in 2006 ), passing through Erzincan and Erzurum. The line is expected to be built in three phases. It will be electrified and double-tracked based on the 250 km/h standard. The design study for the Sivas–Erzincan section was completed by Italian-based SWS Engineering in July 2021. The project will include 59 bridges totaling 17 km, and 35 tunnels totaling 170 km through a region with high seismicity and difficult hydrogeological conditions. The 247 km section will start from the current station in Sivas, through Hafik, Zara, Imranli, Refahiye, and end in Erzincan.
Ankara-Kayseri
A 142 km double-tracked electrified spur off of the Ankara-Sivas line, planned from Yerköy to Kayseri, construction began in July 2022, and is planned for completion by 2026, reducing travel times from Ankara to under 2 hours with a design speed of 250 km/h.
Osmaneli-Bursa-Bandırma
The 201 km spur off the Istanbul-Ankara line from Osmaneli to Bandırma through Bursa is under construction and is slated for completion by 2026; the full line will be built for 200 km/h operation and cost 9.5 billion lira, bringing travel times between Ankara and Bursa to 2 hours and 10 minutes. The line is 80% complete as of December 2023.
Istanbul-Edirne-Kapıkule
A 229 km line on the European side of the Bosporus will connect Halkalı station in Istanbul with Kapıkule railway station in Edirne. Construction started in 2019 with an anticipated opening in 2025, and the project will reduce travel times from 4 hours to 1 hour 20 minutes. The double-tracked electrified railway will be built for 215 km/h operation and cost 10.5 billion lira, of which more than half is provided by a European Union grant.
Karaman-Ulukışla-Yenice
A further 135 km extension Ankara-Konya-Karaman line is currently in construction to Ulukışla, which is 89% complete as of winter 2022. Extensions from Ulukışla to Yenice and Aksaray are in the process of being tendered as of 2021, the 200 km/h line is planned to eventually connect to Mersin - Adana - Gaziantep high speed line. The Mersin-Adana-Osmaniye-Gaziantep high speed line is expected to open in 2024.
Ankara–İzmir high-speed line
The project has started and is tentatively planned to open in 2027. The line will pass through Afyon to meet the high-speed line from Ankara to Istanbul near Polatlı. It will have a length of 624 km, with a projected running speed of 250 km/h The travel will take 3 hours and 30 minutes. The construction of line is planned in three phases:
High-speed train sets and production facilities
TREVI ETR 500 test trains
The first high-speed trains to run on Turkish rails were two ETR 500 train sets rented from Trenitalia of Italy and were used for testing the completed part of the high-speed railway network, between Eskişehir and Ankara, on 23 April 2007. During the tests, ETR 500 Y2 achieved the current rail speed record in Turkey, reaching 303 km/h.
Siemens Velaro TR
The Velaro TR (TCDD HT80000) is a Velaro D derived 8-car standard gauge high-speed train for the Turkish State Railways (TCDD). The eight cars, totalling a length of 200 m, can accommodate 519 passengers and reach a top speed of 300 km/h. 25 kV 50 Hz AC power the train with a total of 8 MW. Turkish State Railways (TCDD) placed an order for seven Velaro high-speed trainsets in July 2013. The contract is worth €285M, including seven years of maintenance. The Velaros are to be deployed on the Turkish high-speed railway network. The first Siemens Velaro TR entered service in 2014. On 18 February 2015, TCDD ordered another 10 Velaro TR for delivery in 2017. The €400M contract include the first three years of maintenance and spareparts. Unlike the traditional white – red – dark blue color scheme used on the TCDD HT65000 high-speed trains, a white – turquoise – grey color scheme has been selected for the livery of TCDD's Velaro TR trains.
EUROTEM
EUROTEM, alternatively Hyundai EURotem, is a joint enterprise between Hyundai Rotem of South Korea and TÜVASAŞ of Turkey which was established in 2006 and started production in December 2007. The Hyundai EURotem factory in Adapazarı, Turkey, was built as the Hızlı Tren Fabrikası (High-Speed Train Factory) with the purpose of manufacturing the next generation of Turkey's high-speed train sets.
Notes and references
This article is derived from Wikipedia and licensed under CC BY-SA 4.0. View the original article.
Wikipedia® is a registered trademark of the
Wikimedia Foundation, Inc.
Bliptext is not
affiliated with or endorsed by Wikipedia or the
Wikimedia Foundation.