Hanul Nuclear Power Plant

1

The Hanul Nuclear Power Plant (originally the Uljin NPP ) is a large nuclear power station in the North Gyeongsang Province of South Korea. The facility has six pressurized water reactors (PWRs) with a total installed capacity of 5,881 MW. The first went online in 1988. In the early 2000s it was the third largest operational nuclear power plant in the world and the second largest in South Korea. The plant's name was changed from Uljin to Hanul in 2013. On 4 May 2012, ground was broken for two new reactors, Shin ("new") Uljin-1 and -2 using APR-1400 reactors. Fuel loading completed at Shin Hanul 1 in October 2021. Unit 1 achieved first criticality on 22 May 2022, 11 am local time with electricity generation expected to start in June 2022. Unit 2 achieved criticality on 6 December 2023, 6 am local time, with grid connection expected for 20 December 2023. The APR-1400 is a Generation III PWR design with a gross capacity of 1400 MW. It is the first to use Korean-made components for all critical systems. In 2012, the reactors were expected to cost about 7 trillion won (US$6 billion), and to be completed by 2018. In September 2024 South Korea's Nuclear Safety and Security Commission issued a licence to Korea Hydro & Nuclear Power for the construction of units 3 and 4 of the Shin Hanul nuclear power plant, scheduled to be completed by 2032, and by 2033.

Reactors

This article is derived from Wikipedia and licensed under CC BY-SA 4.0. View the original article.

Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc.
Bliptext is not affiliated with or endorsed by Wikipedia or the Wikimedia Foundation.

View original