GWR 2800 Class

1

The Great Western Railway (GWR) 2800 Class is a class of Churchward-designed 2-8-0 steam locomotive.

History

The class was designed by George Jackson Churchward for heavy freight work. They were the first 2-8-0 locomotive class in Great Britain. The prototype, originally numbered 97 but later renumbered 2800, appeared in 1903. Construction of the production series commenced in 1905 and continued until 1919. The 2884 Class which appeared in 1938–1942 was developed from the 2800 class and is sometimes classified with it.

Prototype

No. 97 was originally outshopped in lined black livery and undertook two years of trials before the type went into production. Initial results suggested that only the front end needed further development and where the boiler of No. 97 was parallel for the first four segments, the production series had the familiar taper boiler. Initially the boiler pressure of the 2-8-0 was set at 200 lbf/in2 with 18 in diameter cylinders. Tractive effort started out at 29775 lbf but was increased substantially in the production engines by enlarging the cylinder diameter to 18+1/2 in and raising the steam pressure to 225 lbf/in2. The 8+1/2 in piston valves were enlarged to 10 in.

Production

The most visible difference between No. 97 and the first of the 1905 production batch was the higher pitch of the boiler (8 ft opposed to 7 ft). At first the prototype was given a 4000 impgal tender but almost without exception the 2800s were harnessed to the 3500 impgal variety throughout their working lives. Superheating was incorporated into the class from 1909 with No. 2808 the first to be retro-fitted. Other modifications centred on improving the weight distribution, altering smokebox lengths and fitting larger diameter chimneys. The 84 2800s built by Churchward were constructed over more than a decade and remained the GWR's principal long haul freight engines throughout the 1920s and 1930s. The only serious problem met with in traffic was with the sealing of the internal steam pipes and beginning in 1934 most of the class had them replaced with outside pipes. This change, along with a side-window cab, were the only notable changes for the later construction when a further 83 locomotives were built over a mere 3 years from 1938.

Operation

The 2800 class was particularly used for hauling heavy trains of coal from the South Wales coalfields to the large conurbations served by the GWR, and large numbers were allocated to sheds in South Wales, but the type was the main heavy freight type on the GWR and was used across the network. Due to the variety of freight flows it was found that individual locomotives could spend extended periods away from their home shed and a container was added to the left hand valence which carried details of boiler washout dates to ensure that this necessary activity was carried out in a timely manner. There was no differentiation in duties between the original 2800 class of 1905 and the modified 2884 design of the 1930s. At the outbreak of World War II, an order was placed for 60 additional locomotives for use in France, but this was cancelled following the evacuation at Dunkirk, the 10 engines that had already been completed being included in the GWR stocklist.

Oil firing

Between 1945 and 1947, coal shortages caused GWR to experiment with oil fired 2800 locomotives and 12 of the 2800 class were converted. They were renumbered into the 4800 series, which necessitated re-numbering the entire 4800 class autotanks into the 1400 series, and reclassified as 1400 class. The experiment, encouraged by the Government was abandoned in 1948 once the extra maintenance costs were calculated and the bill had arrived for the imported oil.

Accidents and incidents

Withdrawal

Preservation

Six 2800 Class locomotives survive, these being 2807, 2818, 2857, 2859, 2873, 2874, along with nine 2884 class locomotives. One additional survivor was used to provide parts for other projects. Only two members of the class have so far operated in preservation, these being 2807 and 2857. As of October 2023, one member of the class is operational. 2857 was withdrawn from service in January 2023. One of the class, No. 2857, briefly operated on the main line in 1985. 2861, built in 1918, was one of the "Barry Ten" and eventually broken up for parts at the Llangollen Railway in 2014 and the frames scrapped. The cylinder and saddle block, along with several other components, are being used in the construction of the next GWR 4700 Class 2-8-0 No. 4709.

Models

Hornby Railways manufacture a model of the 28xx in OO gauge. Dapol have announced their own OO model, including a website-exclusive model of the preserved 2874. Dapol will make financial contributions to the 2874 Trust based on the sales of the exclusive model.

Citations

This article is derived from Wikipedia and licensed under CC BY-SA 4.0. View the original article.

Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc.
Bliptext is not affiliated with or endorsed by Wikipedia or the Wikimedia Foundation.

Edit article