Contents
Guangdong Pumped Storage Power Station
The Guangdong Pumped Storage Power Station or Guangzhou Pumped Storage Power Station is a pumped-storage hydroelectric power station near Guangzhou, Guangdong Province, China. Power is generated by utilizing eight turbines, each with a 300 MW capacity, totalling the installed capacity to 2400 MW. The generated power is sold to CLP customers in Hong Kong. The power station was constructed in two stages, the first four turbines were completed in 1994 and the second four in 2000.
Operation
The station is composed mainly of a lower and upper reservoir and an underground power station. Water for the system is derived from the Liuxihe River. The lower reservoir has a capacity of 23400000 m3 and is created by a 43.5 m tall and 153.12 m long gravity dam composed of roller-compacted concrete. Water from this reservoir is pumped into the upper reservoir which is created by a 68 m tall and 318.52 m long concrete face rock-fill embankment dam and has a capacity of 23400000 m3. Water from the upper reservoir can then be re-released down two penstocks towards the power station. The same reversible pumps that moved the water up can now generate electricity. Just before reaching the power station, the two penstocks each split off into four separate branch pipes, each feeding one of the eight reversible 300 MW turbine generators with water. Once power generation is complete, the generators can reverse, pump the water back up to the upper reservoir and resume the process over again.
This article is derived from Wikipedia and licensed under CC BY-SA 4.0. View the original article.
Wikipedia® is a registered trademark of the
Wikimedia Foundation, Inc.
Bliptext is not
affiliated with or endorsed by Wikipedia or the
Wikimedia Foundation.