Girard Point Bridge

1

The Girard Point Bridge is a double-decked cantilevered truss bridge carrying Interstate 95 across the Schuylkill River in the American city of Philadelphia, Pennsylvania. The bridge was opened in 1973. It is the last crossing of the Schuylkill River, which empties into the Delaware River less than half a mile downstream. It is crossed by an average of 148,500 vehicles per day, including 6% truck traffic.

History

Construction and renovation in 2010 and 2011

The Pennsylvania Department of Transportation selected Buckley and Co. as the main contractor and a joint venture between Alpha-Liberty Painting as the paint contractor. The bridge deck was milled and a new surface was poured and the structural steel was painted in order to extend the life of the steel. Work finished in the fall of 2011, but restarted in 2012 for expansion-joint replacement.

This article is derived from Wikipedia and licensed under CC BY-SA 4.0. View the original article.

Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc.
Bliptext is not affiliated with or endorsed by Wikipedia or the Wikimedia Foundation.

View original