The Doiceşti Power Station was a large thermal power plant located in Doicești, with seven generation groups, six of twenty MW each and two of 200 MW resulting in a total electricity generation capacity of 520 MW. It used Lignite as main fuel supplemented by Natural gas. The chimney used by the 200 MW units was 208 metres tall. It was demolished to clear the site for the new project using a Small modular reactor.

Operations

Extension plans

In 2011 Termoelectrica, the owner of the powerplant, and China Huadian Engineering agreed to build two new units of 250 MW each. The extension was cancelled in 2014 after the dissolution of Termoelectrica. Doicești location was selected to implement NuScale Power VOYGR-6 model of a nuclear power plant that will deploy six SMRs of 77 MW each with a total capacity of 462 MW. For this project Nuclearelectrica formed a new company RoPower, with equal shares with the plant owner Nova Power&Gas. RoPower signed the contract with NuScale Power for phase 1 of front-end engineering and design.

This article is derived from Wikipedia and licensed under CC BY-SA 4.0. View the original article.

Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc.
Bliptext is not affiliated with or endorsed by Wikipedia or the Wikimedia Foundation.

Edit article