Baltic 1 Offshore Wind Farm

1

EnBW Baltic 1 is the first commercial offshore wind farm of Germany in the Baltic Sea. Siemens supplied 21 SWT 2.3-93 wind turbines for the 48.3 megawatt wind farm. EnBW Baltic 1 is located about 16 km north of the Darss-Zingst Peninsula and covers about seven square kilometers. Work started in July 2010; the wind farm was officially commissioned on 2 May 2011. Due to the Kriegers Flak Combined Grid Solution, power from Sweden (via Zealand), the 600 MW Kriegers Flak, the 288 MW Baltic 2 is sent via Baltic 1 to Germany, and is synchronized to the Nordic grid (not the German grid) via a 150 kV 400 MW alternating current subsea cable.

Generation

This article is derived from Wikipedia and licensed under CC BY-SA 4.0. View the original article.

Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc.
Bliptext is not affiliated with or endorsed by Wikipedia or the Wikimedia Foundation.

Edit article