Azeri (Azerbaijani: Azəri) is an offshore oil field in the Caspian Sea, located 100 km east of Baku, Azerbaijan and is a part of the larger Azeri-Chirag-Guneshli (ACG) project. The Azeri field includes Central Azeri, West Azeri, East Azeri production platforms compression and water injection platform (C&WP). The field was discovered in 1988, and originally it was named after 26 Baku Commissars.

Central Azeri

Central Azeri is a production, drilling and quarters (PDQ) platform located in nearly 128 m depth of water in the central part of the Azeri field. The platform is constructed to produce approximately 420000 oilbbl/d. The facilities on Central Azeri include: Central Azeri has started its operations in February 2005

West Azeri

West Azeri is a production, drilling and quarters (PDQ) platform located in 120 m depth of water and was constructed to produce oil from the western section of Azeri field. West Azeri adds 300000 oilbbl/d to the overall ACG production. The facilities on West Azeri include: The platform has started its operations in December 2005.

East Azeri

East Azeri is a production, drilling and quarters (PDQ) platform located in 150 m depth of water and was constructed to produce oil from the eastern section of Azeri field. East Azeri produces 260000 oilbbl/d. The facilities on East Azeri include: The platform has started its operations in October 2006.

Compression and water injection platform (C&WP)

The C&WP supplies Central, West and East Azeri platforms with water and gas injection services, manages gas export and provides electrical power using 10 Rolls-Royce turbines. The platform is bridge linked to Central Azeri platform. Gas injection capacity at C&WP is 1 e9cuft/d utilizing 5 gas injection wells. Water injection capacity is 1 Moilbbl/d utilizing 12 water injection wells. Gas export capacity stands at 250 e6cuft/d. Azeri C&WP has some of the largest water injection pumps and gas injection compressors among BP platforms worldwide. The topsides have been constructed in the ATA (AMEC-Azfen-Tekfen) construction yard in Bibi-Heybat, Azerbaijan.

2008 gas leak and blowout

On 17 September 2008, a gas leak was discovered in the area of the Central Azeri platform after blowout in a gas-injection well. The platform was shut down and the staff was evacuated. As the West Azeri Platform was being powered by a cable from the Central Azeri Platform, it was also shut down. BP, an operator of ACG, suspected a bad cement job caused the leaking gas. Production at the West Azeri Platform resumed on 9 October 2008 and at the Central Azeri Platform in December 2008.

This article is derived from Wikipedia and licensed under CC BY-SA 4.0. View the original article.

Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc.
Bliptext is not affiliated with or endorsed by Wikipedia or the Wikimedia Foundation.

Edit article