Akinada Bridge

1

The Akinada Bridge (安芸灘大橋) is a suspension bridge in Kure, Hiroshima, Japan that crosses the Seto Inland Sea. Completed in 1999, it has a main span of 750 m. The first and largest bridge on the Akinada Tobishima Kaido, it was constructed by Penta-Ocean Construction, at a cost of 50 billion yen.

Overview

The bridge was opened to traffic on 18 January 2000. The bridge is part of Hiroshima Prefecture Route 74, a route that begins in Honshu and crosses over the Seto Inland Sea via the Akinada Bridge to Shimo-kamagari Island to the south. The bridge is tolled and operated by the Hiroshima Prefecture Road Corporation. It is the longest bridge in Japan to be maintained by a prefecture. The average daily traffic volume on the bridge was 4,000 vehicles by May 2000, far exceeding the expected volume of 2,400 vehicles using it every day.

This article is derived from Wikipedia and licensed under CC BY-SA 4.0. View the original article.

Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc.
Bliptext is not affiliated with or endorsed by Wikipedia or the Wikimedia Foundation.

Edit article